Land Sea Air ManufacturingLand Sea Air Manufacturing
  • Home
    • SMED - Single Minute Exchange of Dies
    • Rapid Response
    • Facilities List
  • About
    • Presidents Message
  • Industries
    • Aerospace
    • Defense
    • Commercial
  • Capabilities
    • Manufacturing Capabilities
    • Managing Material Stress
  • Quality
    • Certifications
  • Join the Team
  • Contact Us

Facility List

Notice: Undefined property: stdClass::$readonly in /home/lsamfg5/public_html/layouts/joomla/tinymce/textarea.php on line 22
>

 

Waterjet

Ward Jet Waterjet

 

Mills

DMG Mori DMU 60 eVo with PH150-8 Pallets

Matsuura 5-Axis Machining Center MAM72-42

CNC Makino A55E Horizontal

3 - CNC Makino A55 Delta Horizontal

CNC Makino A88 Horizontal

CNC Mori Seiki SV-500/40 

CNC Mori Seiki MV-653 

CNC HAAS VF3 

 

Lathes

CNC Mori Seiki SL-204 Lathe

2 - CNC Mori Seiki AL-2 Lathes

CNC Mori Seiki SL-25 Lathe

CNC Mori Seiki AL-1 Lathe

CNC Mori Seiki SL-3 Lathe

 

Quality

Brown and Sharp Microexcel

Brown and Sharp Global Image 7107

Brown and Sharp Global Image

SMED - Single Minute Exchange of Dies

Land Sea Air Manufacturing's processes leverage lean business practices including SMED (Single Minute Exchange of Dies). This quick change business process dramatically reduces the time it takes to complete equipment changeovers and restore equipment to productivity.

The essence of the Land Sea Air Manufacturing's SMED process is actually very simple. Convert as many changeover steps as possible to “external” such that they are performed while the equipment is running. This simplifies and streamlines the manufacturing process while reducing risk and setup errors.

By leveraging proprietary business process improvements including state of the art work holding, standardized tool setting, marked locators (zero indicators), multi-pallet, and multi tombstone equipment, our setup process is expedited. This is particularly valuable to satisfy urgent customer requirements.

Best of all, this translates into higher quality, shorter lead time and lower total cost for our customers. 

Rapid Response

Planning and supply chain management are all essential to success for and with our partners. At Land Sea Air Manufacturing, we respond quickly. Quotes are processed in 1 - 3 business days depending on complexity. Once an order is placed, we begin work immediately.

Material is staged and planning is often complete in-parallel with finalizing the order. The result is a substantially faster delivery. In many cases, shipments from Land Sea Air Manufacturing are made four times faster than our competitors.

Most Read

  • Rapid Response
  • Contact Us
  • Presidents Message
  • Manufacturing Capabilities
  • Certifications

Back to Top

© 2025 Land Sea Air Manufacturing